Pu'erHebei Provincial Hospital of Traditional Chinese Medicine (Phases I and II)

● Logistics method: Pneumatic logistics ● Project location: Shijiazhuang ● Hebei Province’s first steel pipe logistics system

Product Description

Project Overview

● Logistics method: Pneumatic logistics

● Project Location: Shijiazhuang

● Hebei Province’s first steel pipe logistics system

● System Scale: Phase I—34 sites; Phase II—20 sites

● Material: 304 stainless steel pipe

● Operating Time:
Phase I was delivered and put into use in December 2015.
Phase II was delivered and put into use in May 2018.